USHTAGAN-Gold

«Ushtagan — Gold» LLP is implementing the project «Construction of a gold-recovery plant by the method of vat cyanidation» at its own deposit.

LOCATION

Pavlodar region, Bayan-Aul settlement

15 tons

potential reserves of gold in ore

500 THOUSAND tons

Factory capacity

1,62

Average grade of gold in ore

1000 l.m.

Total drilling volume for 2024

GEOLOGY OF THE FIELD

The deposit is confined to the near-contact part of subvolcanic intrusions of plagiogranite-porphyry and granite-porphyry with the Lower-Middle Devonian effusive sequence. The area of the deposit is located within the ancient volcanic apparatus. The remnant is well preserved in relief and has the shape of a conical part, the walls of which are represented by tuffaceous and effusive formations of acidic composition, in places strongly silicified, tourmalinized and pyritized. In the relief on the day surface, the described ring structure is represented by three hills composed of quartz-sericite-tourmaline and quartztourmaline rocks. The size of the structure is about 1000 x 800 m. Fracture tectonics in the area is quite clear. Mineralization is traced from the surface and up to 270m deep. A total of 18 ore bodies have been identified at the deposit. Of these, ore body No. 1 is the longest at 335.0 m, the shortest at ore body No. 2a is 45.0 m. The morphology of ore bodies is complex: their thickness varies from 0.9 m to 70 — 80 degrees falling to the northeast. Average gold grades in ore bodies vary slightly: from 0.5 g/t (s.t. 1c) to 20 g/t (s.t. 2), the distribution of gold in the deposit is quite uniform. The maximum depth of undercutting of ore bodies: ore body No. 1-270 m. This indicates a large scope Average gold grades in ore bodies vary slightly: from 0.5 g/t (s.t. 1c) to 20 g/t (s.t. 2), the distribution of gold in the deposit is quite uniform. The maximum depth of undercutting of ore bodies: ore body No. 1-270 m. This indicates a large scope Average gold grades in ore bodies vary slightly: from 0.5 g/t (s.t. 1c) to 20 g/t (s.t. 2), the distribution of gold in the deposit is quite uniform. The maximum depth of undercutting of ore bodies: ore body No. 1-270 m. This indicates a large scope 2016 — 2019 — Geological exploration work was carried out, the number of wells: 24, the total volume is 1510.4 linear DEKABRSKOE DEPOSIT mineralization and the possibility of converting predicted resources into balance reserves of industrial categories.

PROJECT STATUS

2022
  • Additional exploration of the appraisal stage deposit with state registration p.i. RK reserves of gold, silver by industrial categories.
  • Carrying out research work on the study of representative samples, with the purpose of determining the optimal technology for extracting gold, the development of technical regulations for the factory.
2022-2023

Design of a processing plant for the processing of gold ore from the Ushtagan deposit, with a capacity of 500 thousand tons per year.

COMPANY'S NEWS

CONTACTS

Tel: +7 (727) 376 67 10

e-mail: info@yasaiholding.com