QARABULAQ GOLD

Kazakhstan gold mining company, forming a modern production cluster in the field of gold mining and processing.

LOCATION

Republic of Kazakhstan, Akmola Region, Stepnogorsk

Final product

DORE alloy

Planned capacity

400 000 tons of ore per year

Factory launch

2024

Potential gold reserves

Up to 10 miion tons

Confirmed reserves

2.47 million tons of ore

General information

QARABULAQ GOLD carries out geological study, exploration, mining, and processing of gold-bearing ores.

The company has passed all the key stages of development — from prospecting to commissioning of the production infrastructure — and is currently at the stage of commercial exploitation of the deposit, ensuring stable extraction and processing of ore.

In its activities, QARABULAQ GOLD combines advanced technologies, engineering expertise and strategic vision, forming a new industrial history of the region.

STAGES OF IMPLEMENTATION

MINERALS RESOURCES AND RESERVES OF THE KARABULAK DEPOSIT

Mineral resources and reserves gold (kg)

Ore, thousand tons

Avarage
g/t content
Stock
category
Protocol
reports
9158,15522,91,66С2+Р1Protocol № 1385 of 06.09.2013г
3344,736001,0Inferred + IndicatedReport SRK 2019
323624731,27С1+С2+off-balace sheetProtocol GKZ RK № 2313-21-U dated 24.05.2021г.
1988-1995

Based on the results of prospecting, mineralized gold-bearing zones in the central part were delineated and mineral resources were calculated with the following indicators: in the P1 + P2 category, gold reserves are 6.43 tons with an average grade of 3.3 g/t with the strike of ore zones up to 600 m and a forecast depth of 300 m.

2013

Following the results of exploration work, the deposit was entered into the State Balance of the Republic of Kazakhstan, and the development of the Karabulak and Dekabrskoye deposits began.

2019

The international company SRK conducted an independent assessment of mineral resources according to JORC standards and prepared recommendations for further study of the site.

2021

The state commission approved reserves within the project quarry, and industrial development of the deposit began.

2024

The processing plant and the first stage of the tailings storage facility are put into operation.

2025

Open-pit mining operations are started with the involvement of contractors and the introduction of a permanent engineering control system.

DEKABRSKOE DEPOSIT

PROJECT RESERVES

Forecast resources category Р1 (thousand tons)

Category С1 (thousand tons)

Category С2 (thousand tons)

Total reserves (thousand tons)

5,9

0

0

5,9

HISTORY OF WORKS DEKABRSKOE

2016 – 2019

Geological exploration work was carried out, the number of wells: 24, the total volume is 1510.4 linear meters. 

2022

Geological exploration of the deposit is was carried out, the total volume is 720 linear meters.

QARABULAQ GOLD

COMPANY'S NEWS

NEW YEAR GREETINGS

Dear citizens of Kazakhstan, Please accept our warmest and sincere congratulations on the upcoming New Year! Today, on the eve of the New year, YASAI

Read More »

CONTACTS

Tel: +7 (727) 376 67 10

e-mail: info@qarabulaqgold.kz