
5.5 billion tenge loan granted to Kazakh salt producer by EBRD
JSC Araltuz planning to build new production facilities and diversify exports Araltuz is leading producer of table and industrial salt in Central Asia. European Bank
Kazakhstan gold mining company, forming a modern production cluster in the field of gold mining and processing.
Republic of Kazakhstan, Akmola Region, Stepnogorsk
DORE alloy
400 000 tons of ore per year
2024
Up to 10 miion tons
2.47 million tons of ore
QARABULAQ GOLD carries out geological study, exploration, mining, and processing of gold-bearing ores.
The company has passed all the key stages of development — from prospecting to commissioning of the production infrastructure — and is currently at the stage of commercial exploitation of the deposit, ensuring stable extraction and processing of ore.
In its activities, QARABULAQ GOLD combines advanced technologies, engineering expertise and strategic vision, forming a new industrial history of the region.
MINERALS RESOURCES AND RESERVES OF THE KARABULAK DEPOSIT | ||||
| Mineral resources and reserves gold (kg) | Ore, thousand tons | Avarage g/t content | Stock category | Protocol reports |
| 9158,1 | 5522,9 | 1,66 | С2+Р1 | Protocol № 1385 of 06.09.2013г |
| 3344,7 | 3600 | 1,0 | Inferred + Indicated | Report SRK 2019 |
| 3236 | 2473 | 1,27 | С1+С2+off-balace sheet | Protocol GKZ RK № 2313-21-U dated 24.05.2021г. |
Based on the results of prospecting, mineralized gold-bearing zones in the central part were delineated and mineral resources were calculated with the following indicators: in the P1 + P2 category, gold reserves are 6.43 tons with an average grade of 3.3 g/t with the strike of ore zones up to 600 m and a forecast depth of 300 m.
Following the results of exploration work, the deposit was entered into the State Balance of the Republic of Kazakhstan, and the development of the Karabulak and Dekabrskoye deposits began.
The international company SRK conducted an independent assessment of mineral resources according to JORC standards and prepared recommendations for further study of the site.
The state commission approved reserves within the project quarry, and industrial development of the deposit began.
The processing plant and the first stage of the tailings storage facility are put into operation.
Open-pit mining operations are started with the involvement of contractors and the introduction of a permanent engineering control system.
|
PROJECT RESERVES |
|||
|
Forecast resources category Р1 (thousand tons) |
Category С1 |
Category С2 |
Total reserves |
|
5,9 |
0 |
0 |
5,9 |
Geological exploration work was carried out, the number of wells: 24, the total volume is 1510.4 linear meters.
Geological exploration of the deposit is was carried out, the total volume is 720 linear meters.

JSC Araltuz planning to build new production facilities and diversify exports Araltuz is leading producer of table and industrial salt in Central Asia. European Bank

The first stage of drilling at the Kurumsak field has been successfully completed. Drilling was carried out using advanced technologies and was based on digitized

Dear citizens of Kazakhstan, Please accept our warmest and sincere congratulations on the upcoming New Year! Today, on the eve of the New year, YASAI